PIT
Objective of the test:To determine the location and the extent
of defects (if any) of driven/bored piles based on the wave reflection
recorded at the pile head
Method of testing:Measurement of sound wave travel along
the pile produced by a hand-hammer impact
Standards for the test:ASTM D5882-00 or following the
Engineer's instructions
Steps to be followed for the test:
1.
Clean small
areas in the pile head.
2.
Attach the accelerometers to the cleaned
area
3.
Turn on the
equipment and enter the parameters
4.
Hit to the
pile head
blows using special hand hammer
5.
Check the
record of each blow, if the signal is not good hit again
6.
Select
"analysis" for good signals
7.
Turn off the equipment and move to other pile
Report, which includes:
-
Project name and location
-
The owner, designer, piling contractor
and the tester
-
Tested pile records
-
Summary table of test results
-
Wave travel graphs
-
Conclusion and recommendation for the
defect piles